Feasibility and pre-FEED studies for refinery, gas processing, green hydrogen and renewable projects. Fixed price upfront. Full report in 15 working days.
* Studies that need process simulation may take 25 working days.
Three steps. Fixed dates.
You describe the need. A senior engineer checks it and sends scope, schedule and a fixed price.
You approve, share the data you have, and we agree the design basis on one call.
Process design, balances, equipment, capex, opex and the business case. Report delivered on day 15.
Your project doesn't stop at the report. Neither do we.
Any change to the report for one month after delivery, at no extra cost. A change in scope is quoted separately.
Our engineers work alongside yours through detailed engineering and procurement.
We help you choose the right EPC, then track cost, schedule and quality through construction.
Built to go straight to your board, your bank or your EPC.
* When simulation is in scope.
Asset-light, with a team sized for each project. No heavy overheads. We meet in person whenever the project needs it.
One number, agreed before we start. No hourly rates. No billing cycles.
15 working days from kick-off to report. Small teams, no waiting.
No endless email chains. We understand the problem, find the right data and deliver the result.
* Compared with typical fees quoted by large consultancies for similar feasibility scope.
Capacity, yield and reliability studies on crude, cracking, hydroprocessing, alkylation and treating units.
Sweetening, dehydration, sulphur recovery and modular plants for small and mid-size fields.
Hydrogen, ammonia and methanol: design basis, technology choice and project economics.
Renewable fuels and energy projects, from first concept to a report the bank will accept.
Process route, design basis, capex, opex and economics for board approval or project finance.
Configuration, balances, PFDs and equipment lists, ready to hand to the FEED contractor.
Models built and tuned to plant data to test cases, solve operating problems and find margin.
What limits your plant at higher throughput, and what each fix costs.
An independent technical and commercial comparison before you sign with a licensor.
Bid evaluation, EPC selection and project tracking through construction.
Our engineers have delivered studies across refining, gas processing and green hydrogen for clients in India and abroad. Client names stay confidential.
Finding what limits a running plant, and what it costs to move past it.
Re-optimizing fractionation and gas recovery sections for higher throughput.
Tracing corrosion in amine systems back to operating conditions, using live plant data.
Pre-FEED simulation and performance studies for large gas processing plants.
Sulphur recovery and tail gas treating designs built to meet emission limits.
Design basis, hydrogen calculations and licensor comparison for green ammonia projects.
Five short steps. We reply with a fixed-price proposal within 3 working days. Happy to sign an NDA before you share detailed data.